Underground Storage Tanks and Compliance
Our Underground Storage Tank (UST) Program enforces the North Carolina Administrative Code Title 15A Subchapters 2N and 2L. Our staff enforces the UST regulations of North Carolina through a memorandum with NC Department of Environmental Quality (DEQ), Division of Waste Management. We determine who is the responsible party for environmental contamination, conduct leak detection compliance inspections, and oversee tank removal, assessment, and remediation.
Underground Storage Tank (UST) systems are regulated by the NC DEQ. The 2N rules establish criteria and standards applicable to regulated USTs and include the requirements and procedures for permanently closing UST systems. The 2N rules do not apply to unregulated USTs. However, when a release from a unregulated UST is discovered or confirmed, the responsible party (tank owner) needs to comply with 15A NCAC 2L .0115 for the assessment and remediation.
Regulated vs. Unregulated USTs
Regulated | Unregulated |
|---|---|
|
|
Leaking Petroleum UST Cleanup Fund
A State Trust Fund is available for the cleanup of leaking petroleum USTs. The commercial fund covers regulated USTs and those unregulated USTs required to be registered, permitted, and to pay annual operating fees. The Non-Commercial Trust Fund has been phased out by Session Law 2015-241 Section 14.16A.
Commercial USTs vs. Non-commercial USTs
Commercial USTs | Non-commercial USTs |
|---|---|
|
|
If you have any questions about the Trust Fund, please contact Guilford County Environmental Health at 336-641-3771, Winston-Salem Regional Office at 336-776-9800, or UST Section Central Office Trust Fund Branch at 919-707-8600.
Notification Requirements
- Following a known or suspected release from an underground storage tank (UST) system, the responsible party (tank owner or operator) is required to submit a 24-Hour Release and UST Leak Reporting Form within 24 hours of discovery of a known or suspected release to the Winston-Salem Regional Office UST Section or Guilford County Environmental Health.
- Before removing a regulated UST, the tank owner or operator must complete and submit a GW/UST-3 Form (UST Permanent Closure of Change-in-Service) at least five (5) working days if a Professional Engineer (P.E.) or a Licensed Geologist (L.G.) provides supervision for closure assessment activities and signs and seals all closure reports. Otherwise, 30 days' notice is required.
Regulatory Procedures for Regulated USTs
Please refer to the UST Section’s Guidelines for Assessment and Corrective Action.
- Within 30 days after closure has been completed, a UST closure report following the UST-12 Format, and a UST-2A, Site Investigation Report for Permanent Closure or Change-In-Service - Registered Tanks or a UST-2B, Site Investigation Report for Permanent Closure or Change-In-Service - Unregistered Tanks, must be completed and submitted to the regional office. A copy of the UST-2A or UST-2B form must be submitted to the UST Section Central Office to change the UST status.
- Once evidence of a petroleum release is discovered, the responsible party must take immediate action to prevent any further release of product from the UST and identify and mitigate any fire, explosion or vapor hazards, remove free product, and comply with the 2N requirements.
- If the responsible party cannot demonstrate that soil contamination has been cleaned up, a limited site assessment report (LSA) must be submitted within 120 days of the discovery of the release. The LSA report must include the information needed by the NC DEQ to assign a land use classification and to determine the risk level for the incident.
- After determining the risk level of the site, the NC DEQ will notify the responsible party about the requirements for assessment and remediation.
Before installing any monitoring/remediation wells at the site, a permit must be obtained from Guilford County Health Department. The well installation application can be downloaded for your use.
UST for Home Heating Oil
Home heating oil tanks are those tanks defined as unregulated, non-commercial USTs above. A list of frequently asked questions has been compiled for your information about heating oil tanks.
UST Compliance
USTs registered with NC DEQ are required to be inspected by Division of Waste Management UST Section. The goal of the compliance inspections is to protect humans and the environment from release from UST’s. The regulations require owners and operators to prevent releases, detect releases, and correct problems caused by releases. An inspection of your UST system and a review of your records will find and help you correct any deficiencies to ensure that human health and the environment are protected and to fulfill the state and EPA requirements. Owners and operators are equally responsible for complying with all applicable UST regulations. Compliance inspections for the past 12 months in North Carolina indicated less than half the facilities inspected are in compliance.
A UST system consists of the underground storage tank, all associated piping and ancillary equipment (e.g. flex connectors, submersible pumps, pipe joints, etc.), and the dispenser (gas pump). Tank owners are required to pay tank fees for their registered tanks even if the tanks are in temporary closure. The fees are part of the owner’s financial responsibility requirements in case of a leak from the system.
Sitting and Secondary Containments
UST systems are required to be sited at certain distance from wells and specified surface waters.
- No regulated UST system (including tank, piping and dispensers) may be installed within 100 feet of the public water supply well. Regulated UST systems may be installed between 100 and 500 feet of public water supply well, but secondary containment (double-walled UST systems with interstitial monitoring) is required.
- No regulated UST system (including tank, piping and dispensers) may be installed within 50 feet of any other well used for human consumption. Regulated UST systems may be installed between 50 and 100 feet of any other well used for human consumption, but secondary containment (double-walled UST systems with interstitial monitoring) is required.
All UST systems installed on or before January 1, 1991 that met “new tank system” performance standards (corrosion protection, spill prevention and overfill prevention) by that date are excluded from these siting and secondary containment regulations.
Suspected Releases
Evidence of a suspected release includes product present in containment sumps, stained soil from an overfill, and/or any growth of the piping or other unusual conditions. Evidence of a release requires that the release be reported and investigated. Release that are 25 gallons or greater must be reported and cleaned up. Owners and/or operators may not know that must report releases less than 25 gallons which cannot be cleaned up within 24 hours.